<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	>
<channel>
	<title>Comments on: Deming and ITIL</title>
	<atom:link href="http://www.pmhut.com/deming-and-itil/feed" rel="self" type="application/rss+xml" />
	<link>http://www.pmhut.com/deming-and-itil</link>
	<description></description>
	<pubDate>Tue, 22 May 2012 18:11:55 +0000</pubDate>
	<generator>http://wordpress.org/?v=abc</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: Aale</title>
		<link>http://www.pmhut.com/deming-and-itil/comment-page-1#comment-554</link>
		<dc:creator>Aale</dc:creator>
		<pubDate>Wed, 13 Feb 2008 16:42:19 +0000</pubDate>
		<guid isPermaLink="false">http://www.pmhut.com/deming-and-itil#comment-554</guid>
		<description>Good description of Deming. Deming was an advocate of scientific experiments, a statistical method which I studied in university.

I think that originally he said: plan an experiment, do it, check the results and act accordingly. In scientific experiment many variables are changed in a systematic way and effects of different variables and the combinations can be analyzed with the method of Variance Anaysis.</description>
		<content:encoded><![CDATA[<p>Good description of Deming. Deming was an advocate of scientific experiments, a statistical method which I studied in university.</p>
<p>I think that originally he said: plan an experiment, do it, check the results and act accordingly. In scientific experiment many variables are changed in a systematic way and effects of different variables and the combinations can be analyzed with the method of Variance Anaysis.</p>
]]></content:encoded>
	</item>
</channel>
</rss>

