<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	>
<channel>
	<title>Comments on: The Final Project Report</title>
	<atom:link href="http://www.pmhut.com/the-final-project-report/feed" rel="self" type="application/rss+xml" />
	<link>http://www.pmhut.com/the-final-project-report</link>
	<description></description>
	<pubDate>Thu, 24 May 2012 18:29:48 +0000</pubDate>
	<generator>http://wordpress.org/?v=abc</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: Phil Simon</title>
		<link>http://www.pmhut.com/the-final-project-report/comment-page-1#comment-12606</link>
		<dc:creator>Phil Simon</dc:creator>
		<pubDate>Fri, 27 Nov 2009 11:01:22 +0000</pubDate>
		<guid isPermaLink="false">http://www.pmhut.com/?p=4291#comment-12606</guid>
		<description>Good post, Michael.

&lt;b&gt;Project strengths and weaknesses. Every project has its own strengths and weaknesses. Documenting them clearly is the sine qua non of the final report. This would be much like a father telling a son how to live life successfully based on the father’s vast experience.&lt;/b&gt;

I assume that this section would include the risks, right? I've been called pessimistic for harping on the future potential for system failure, but I feel that it's part of my responsibility.

What do you think?</description>
		<content:encoded><![CDATA[<p>Good post, Michael.</p>
<p><b>Project strengths and weaknesses. Every project has its own strengths and weaknesses. Documenting them clearly is the sine qua non of the final report. This would be much like a father telling a son how to live life successfully based on the father’s vast experience.</b></p>
<p>I assume that this section would include the risks, right? I&#8217;ve been called pessimistic for harping on the future potential for system failure, but I feel that it&#8217;s part of my responsibility.</p>
<p>What do you think?</p>
]]></content:encoded>
	</item>
</channel>
</rss>

